California · CALeVIP Fast Charge

California funding for EV charging at your property

Up to $100,000 per charging port in Window 2

For eligible public DC fast charging with at least 275 kW guaranteed output per port. Lower-power eligible ports: up to $55,000. Awards cannot exceed approved costs and depend on program approval and funding.

VoltLogic screens your property, identifies a suitable funding path, and helps prepare your application.

No obligation. Start with a quick site-readiness review.

See program facts
Window 2
October 7, 2026 – January 14, 2027
Per-port cap
Up to $100,000 per charging port
Award method
First-come, ready-to-build

Built for

  • Gas stations
  • Convenience stores
  • Fuel retailers
  • Grocery locations
  • Other commercial properties

The opportunity

You should not have to figure out which funding window you belong in.

California’s Fast Charge California Project (FCCP), part of CALeVIP, provides incentives for purchasing and installing publicly accessible DC fast chargers. Incentives may cover up to 100% of a project’s total approved costs, subject to per-port caps. Funding is awarded first-come, first-served to ready-to-build projects.

There are two upcoming application windows — Window 2 and Window 3 — with different dates and incentive caps. Those are program mechanics. What most owners need first is simpler: whether the property is worth pursuing, and what to do next.

VoltLogic screens the site, identifies the FCCP path that appears most applicable, and helps prepare the work. If one path does not proceed, we can continue evaluating later applicable opportunities so the project does not go cold.

  1. Ready now

    Window 2

    October 7, 2026 – January 14, 2027

    Upcoming application window for ready-to-build public DC fast charging.

  2. If not selected, not ready, or different timing

    Keep the project moving

    Continue the site review

    Official rules do not automatically transfer a Window 2 application into Window 3. VoltLogic can continue evaluating later applicable paths.

  3. Next published window

    Window 3

    February 24, 2027 – May 27, 2027

    Also requires ready-to-build projects. Separate terms and application, with up to $55,000 per port.

How VoltLogic helps

Findings first. Then a clear next step.

We help evaluate, prepare, coordinate, and navigate. We do not award incentives, and we do not decide eligibility — the program administrator does.

  1. 01

    Site screen

    We review the property and basic project information to see whether a Fast Charge California path is worth pursuing.

  2. 02

    Program fit

    We evaluate which current FCCP opportunity appears most applicable — including timing, site type, and readiness — without asking you to pick a window first.

  3. 03

    Application readiness

    We help organize the information and project requirements needed to pursue the opportunity, including what still has to be in place for a ready-to-build application.

  4. 04

    Keep the project moving

    If the initial opportunity does not proceed, we can evaluate whether another current or future program path may fit — so the work already done is not discarded.

Readiness check

A useful screen is not the same thing as an official application.

VoltLogic uses the screening information below to assess whether a project is worth pursuing. The official checklist summarizes Window 2 requirements published by CALeVIP. Window 3 details must be checked against its own final rules. We never treat our screening preferences as program rules.

A · VoltLogic screening

Helpful to start a review

Start with your contact details, property address and business type. Other details can follow.

  • Property address

    Where the chargers would be located.

  • Property / business type

    Gas station, grocery, retail, and similar.

  • Site control

    Own, lease, or other authority to use the site.

  • Utility provider

    Who serves the property, if known.

  • Existing electrical service

    What is already on site, if known.

  • Utility bills

    Helpful for load and rate context — not required to start.

  • Parking / site layout

    How customers currently move through the property.

  • Existing EV charging

    None, Level 2, or DC fast charging already in place.

  • Desired charging use

    Public customer charging, fleet, or mixed.

  • Project timing

    Whether the site may be ready for the current window or needs more time.

B · Official Window 2 requirements

Needed to apply for reserved funds

Published by CALeVIP. Final eligibility is determined by CSE / CEC.

  • Eligible existing site type

    Must match a listed site type in the Implementation Manual. Gas stations with on-site stores or services, grocery, and many retail sites are listed. Charging hubs, hotels, and business districts are not eligible.

  • Public access

    Sites must be publicly available. Most site types: 24 hours a day, 365 days a year. Parking-primary sites: at least 18 hours a day, seven days a week, excluding holidays.

  • Ready-to-build

    Issued permit and final utility service design, or a utility letter that no upgrade is needed. Incomplete applications are ineligible for a reservation.

  • Equipment owner = applicant

    The applicant must be both the incentive recipient and the owner of the charging equipment.

  • Port count and power

    4–20 incentivized ports per site. Minimum 150 kW guaranteed output per port.

  • ENERGY STAR equipment

    Funded DC fast chargers must be ENERGY STAR certified, with a published out-of-scope exception.

  • Paved, existing site

    Existing paved sites only. No unpaved spaces, no new site development, and no CEQA exemptions for unpaved sites in these windows.

Program facts

Two windows. One screening conversation.

The California Energy Commission announced $55.2 million in new CALeVIP funding across these two Fast Charge California Project windows. Both windows fund publicly accessible DC fast chargers statewide and require ready-to-build projects. Connector rules and per-port caps differ.

Window 2

Up to $100,000 per charging port

Application window
October 7, 2026 – January 14, 2027
By power level
150 kW – 274.99 kW: $55,000 per port · 275 kW and above: $100,000 per port
Connectors
At least 50% of connectors at the site must be CCS. CCS and J3400 ports may be eligible.
Ports
Minimum 4 charging ports and maximum 20 incentivized ports per site.

Window 3

Up to $55,000 per charging port

Application window
February 24, 2027 – May 27, 2027
By power level
150 kW and above: $55,000 per port (no $100,000 / 275 kW+ tier)
Connectors
J3400 and CCS connectors are eligible, with one CCS connector required per site. The $100,000 / 275 kW+ incentive category is not offered; equipment at 150 kW and above is capped at $55,000 per port.
Ports
Minimum 4 charging ports and maximum 20 incentivized ports per site.

Applications open October 7, 2026 at 9:00 a.m. PT and close January 14, 2027 at 5:00 p.m. PT. Application window published as February 24, 2027 – May 27, 2027. Exact daily open/close times were not listed on the Window 3 page as of the verification date. CALeVIP notes that a fuller Window 3 webpage may still be released. Confirm current terms in the official Implementation Manual before relying on any figure. Official CALeVIP materials do not state that a Window 2 application automatically transfers into Window 3. If one path does not proceed, a later window is a separate application under that window’s published rules.

Next step

Could this property be worth a closer look?

Send a few details. VoltLogic will screen the site and follow up with what appears applicable — and what is still unknown.

Check My Property

VoltLogic is an independent, findings-first energy advisor and project originator. Licensed contractors perform installation. VoltLogic does not guarantee eligibility, acceptance, incentive reservation, funding, approval, or savings.